Category Ranking

98%

Total Visits

921

Avg Visit Duration

2 minutes

Citations

20

Article Abstract

Background: Functional group composition may affect invasion in two ways the effect of abundance, i.e. dominance of functional group; and the effect of traits, i.e. identity of functional groups. However, few studies have focused on the role of abundance of functional group on invasion resistance. Moreover, how resource availability influences the role of the dominant functional group in invasion resistance is even less understood.

Methodology/principal Findings: In this experiment, we established experimental pots using four different functional groups (annual grass, perennial grass, deciduous shrub or arbor and evergreen shrub or arbor), and the dominant functional group was manipulated. These experimental pots were respectively constructed at different soil nitrogen levels (control and fertilized). After one year of growth, we added seeds of 20 different species (five species per functional group) to the experimental pots. Fertilization significantly increased the overall invasion success, while dominant functional group had little effect on overall invasion success. When invaders were grouped into functional groups, invaders generally had lower success in pots dominated by the same functional group in the control pots. However, individual invaders of the same functional group exhibited different invasion patterns. Fertilization generally increased success of invaders in pots dominated by the same than by another functional group. However, fertilization led to great differences for individual invaders.

Conclusions/significance: The results showed that the dominant functional group, independent of functional group identity, had a significant effect on the composition of invaders. We suggest that the limiting similarity hypothesis may be applicable at the functional group level, and limiting similarity may have a limited role for individual invaders as shown by the inconsistent effects of dominant functional group and fertilization.

Download full-text PDF

Source
http://www.ncbi.nlm.nih.gov/pmc/articles/PMC3805585PMC
http://journals.plos.org/plosone/article?id=10.1371/journal.pone.0077220PLOS

Publication Analysis

Top Keywords

functional group
60
dominant functional
24
functional
17
group
15
invasion resistance
12
functional groups
12
group invasion
12
experimental pots
12
resistance resource
8
shrub arbor
8

Similar Publications

Background: Limited evidence exists regarding the cognitive and physical improvement effects of medium-chain triglyceride (MCT) intake in patients with stroke. This study aimed to investigate the association between MCT-enhanced rice consumption and enhancements in outcomes, including cognitive level, in patients following stroke.

Methods: We performed a retrospective cohort study on adults admitted to a rehabilitation center with cognitive decline following acute stroke.

View Article and Find Full Text PDF

Background: Fish are the largest group of vertebrates. Studying the characteristics, functions, and interactions of different fish cells is important for understanding their roles in disease and evolution. However, most single cell RNA-seq studies in fish are restricted to a few specific organs, leaving a comprehensive cell landscape that aims to characterize the heterogeneity and connections among body-wide organs largely unexplored.

View Article and Find Full Text PDF

Background: Hypertension remains a critical public health issue in Germany, affecting millions of individuals. Mobile health applications (mHealth apps) offer promising solutions for improving patient outcomes and adherence in hypertension management. Despite their advantages in healthcare, the adoption of mHealth apps by general practitioners (GPs) in Germany remains limited to date.

View Article and Find Full Text PDF

LONP1 Variants Are Associated With Clinically Diverse Phenotypes.

Clin Genet

September 2025

Department of Pediatrics, Boston Children's Hospital, Harvard Medical School, Boston, Massachusetts, USA.

LONP1 encodes a mitochondrial protease essential for protein quality control and metabolism. Variants in LONP1 are associated with a diverse and expanding spectrum of disorders, including Cerebral, Ocular, Dental, Auricular, and Skeletal anomalies syndrome (CODAS), congenital diaphragmatic hernia (CDH), and neurodevelopmental disorders (NDD), with some individuals exhibiting features of mitochondrial encephalopathy. We report 16 novel LONP1 variants identified in 16 individuals (11 with NDD, 5 with CDH), further expanding the clinical spectrum.

View Article and Find Full Text PDF

ASO Practice Guidelines Series: Soft Tissue Sarcoma of the Extremities and Superficial Trunk.

Ann Surg Oncol

September 2025

Division of Surgical Oncology, Department of Surgery, Winship Cancer Institute, Emory University, Atlanta, GA, USA.

Soft tissue sarcomas (STS) are a heterogeneous group of rare malignant tumors arising from mesenchymal tissues, with extremity and superficial trunk STS (eSTS) comprising the majority of cases. The management of localized eSTS requires a multidisciplinary approach to optimize oncologic and functional outcomes. This review outlines the natural history, diagnostic workup, and treatment principles for localized eSTS, emphasizing the role of histology-specific considerations in guiding management strategies.

View Article and Find Full Text PDF