A PHP Error was encountered

Severity: Warning

Message: file_get_contents(https://...@gmail.com&api_key=61f08fa0b96a73de8c900d749fcb997acc09&a=1): Failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests

Filename: helpers/my_audit_helper.php

Line Number: 197

Backtrace:

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 197
Function: file_get_contents

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 271
Function: simplexml_load_file_from_url

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 1075
Function: getPubMedXML

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 3195
Function: GetPubMedArticleOutput_2016

File: /var/www/html/application/controllers/Detail.php
Line: 597
Function: pubMedSearch_Global

File: /var/www/html/application/controllers/Detail.php
Line: 511
Function: pubMedGetRelatedKeyword

File: /var/www/html/index.php
Line: 317
Function: require_once

Research on Obstacle-Avoidance Trajectory Planning for Drill and Anchor Materials Handling by a Mechanical Arm on a Coal Mine Drilling and Anchoring Robot. | LitMetric

Category Ranking

98%

Total Visits

921

Avg Visit Duration

2 minutes

Citations

20

Article Abstract

At present, China's coal mine permanent tunneling support commonly uses mechanized drilling and anchoring equipment; there are low support efficiency, labor intensity, and other issues. In order to further improve the support efficiency and liberate productivity, this paper further researches the trajectory planning of the drilling and anchoring materials of the robotic arm for the drilling machine "grasping-carrying-loading-unloading" on the basis of the drilling and anchoring robotic system designed by the team in the previous stage. Firstly, the kinematic model of the robotic arm with material was established by improving the D-H parameter method. Then, the working space of the robotic arm with the material was analyzed using the Monte Carlo method. The singular bit-shaped region of the robotic arm was restricted, and obstacles were removed from the working space. The inverse kinematics was utilized to solve the feasible domain of the robotic arm with material. Secondly, in order to avoid blind searching, the guidance of the Bi-RRT algorithm was improved by adding the target guidance factor, and the two-way tree connection strategy for determining the feasible domain was combined with the Bi-RRT algorithm's feasible domain judgment bi-directional tree connection strategy to improve the convergence speed of the Bi-RRT algorithm. Then, in order to adapt to the dynamic environment and avoid the global planning algorithm from falling into the local minima, on the basis of the above planning methods, an improved Bi-RRT trajectory planning algorithm incorporating the artificial potential field was proposed, which takes the planned paths as the guiding potential field of the artificial potential field to make full use of the global information and avoid falling into the local minimization. Finally, a simulation environment was built in a ROS environment to compare and analyze the planning effect of different algorithms. The simulation results showed that the improved Bi-RRT trajectory planning algorithm incorporating the artificial potential field improved the optimization speed by 69.8% and shortened the trajectory length by 46.6% compared with the traditional RRT algorithm.

Download full-text PDF

Source
http://www.ncbi.nlm.nih.gov/pmc/articles/PMC11548629PMC
http://dx.doi.org/10.3390/s24216866DOI Listing

Publication Analysis

Top Keywords

robotic arm
20
trajectory planning
16
drilling anchoring
16
potential field
16
arm material
12
feasible domain
12
planning algorithm
12
artificial potential
12
coal mine
8
support efficiency
8

Similar Publications