Category Ranking

98%

Total Visits

921

Avg Visit Duration

2 minutes

Citations

20

Article Abstract

This study outlines the decommissioning process of an 11 MeV self-shielded medical cyclotron operated for over 12 years at the Ospedale San Raffaele, Milano, Italy. A comprehensive analysis of neutron-induced activation in the vault walls was performed to guide safe demolition procedures. Using FLUKA Monte Carlo simulations and laboratory-based gamma and beta spectrometry, the activity of long-lived radionuclides, particularly Fe, was evaluated across multiple wall depths. Results demonstrated that residual activity was primarily confined to the top 5 cm of the wall, with some samples exceeding the Italian clearance level of 1 Bq g for Fe. Occupational exposure to demolition staff was assessed via external dosimeters and internal contamination checks, with all values reported below regulatory limits. These findings confirm that while personnel are not at radiological risk, certain components and wall materials must be classified as low-level radioactive waste (LLRW) and require long-term storage.

Download full-text PDF

Source
http://dx.doi.org/10.1016/j.ejmp.2025.105060DOI Listing

Publication Analysis

Top Keywords

vault walls
8
11 mev self-shielded
8
self-shielded medical
8
medical cyclotron
8
decommissioning procedure
4
procedure induced
4
induced activation
4
activation levels
4
levels vault
4
walls 11 mev
4

Similar Publications

This study outlines the decommissioning process of an 11 MeV self-shielded medical cyclotron operated for over 12 years at the Ospedale San Raffaele, Milano, Italy. A comprehensive analysis of neutron-induced activation in the vault walls was performed to guide safe demolition procedures. Using FLUKA Monte Carlo simulations and laboratory-based gamma and beta spectrometry, the activity of long-lived radionuclides, particularly Fe, was evaluated across multiple wall depths.

View Article and Find Full Text PDF

Removal of the dorsal hump in structural rhinoplasty disarticulates the upper lateral cartilages (ULCs) from the septum, resulting in a loss of control over the medial and posterior displacement of the lateral nasal walls. This consequently leads to disruption of the dorsal aesthetic lines (DALs) in oblique and frontal views. The inability to control this disadvantage has been a major factor driving the search for alternative approaches, such as dorsal preservation rhinoplasty, over the past decade.

View Article and Find Full Text PDF

: POP (pelvic organ prolapse) involves the descent of one or more pelvic organs downwards with or without protrusion from the vaginal opening, caused by the relaxation and weakening of ligaments, connective tissue, and pelvic muscles. Such an outcome negatively impacts the quality of life. The gold standard procedure for repairing apical compartment prolapse is colposacropexy (CS) to secure the anterior and posterior walls of the vagina to the anterior longitudinal sacral ligament, located anteriorly to the sacral promontory, using a mesh.

View Article and Find Full Text PDF

Decommissioning of a Medical Cyclotron Vault: The Case Study of the National Cancer Institute of Milano.

Health Phys

August 2024

Radiation protection unit, Fondazione IRCCS Istituto Nazionale dei Tumori di Milano, Via Venezian 1, 20133, Milano, Italy.

In the widespread use of medical cyclotrons for isotope production, radiological and economic consequences related to the decommissioning of particle accelerators are often neglected. However, decommissioning regulation and its related procedures always demand efforts and costs that can unexpectedly impact on budgets. The magnitude of this impact depends strongly on the residual radioactivity of the accelerator and of the vault, and more specifically on the kind and activity concentration of residual radionuclides.

View Article and Find Full Text PDF

Experimental study on the damage performance and forced response of concrete lining in fault-crossing tunnel.

Sci Rep

January 2024

Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, School of Civil Engineering, Southwest Jiaotong University, Chengdu, 610031, Sichuan, China.

Understanding the adverse effects of tunnel crossing active faults on tunnel structures is crucial for ensuring their safe operation and construction. This paper presents the results of a series of model tests conducted at a scale of 1:40 using a fault sliding test box. Three sets of fault comparison tests were carried out, namely: (1) the tunnel does not cross the fault, (2) the spring stiffness is reduced, and (3) the model is not reinforced.

View Article and Find Full Text PDF