A PHP Error was encountered

Severity: Warning

Message: file_get_contents(https://...@gmail.com&api_key=61f08fa0b96a73de8c900d749fcb997acc09&a=1): Failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests

Filename: helpers/my_audit_helper.php

Line Number: 197

Backtrace:

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 197
Function: file_get_contents

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 271
Function: simplexml_load_file_from_url

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 3165
Function: getPubMedXML

File: /var/www/html/application/controllers/Detail.php
Line: 597
Function: pubMedSearch_Global

File: /var/www/html/application/controllers/Detail.php
Line: 511
Function: pubMedGetRelatedKeyword

File: /var/www/html/index.php
Line: 317
Function: require_once

Surrounding rock control for the roadway driven under the goafs of small collieries and heading for adjacent advancing face. | LitMetric

Surrounding rock control for the roadway driven under the goafs of small collieries and heading for adjacent advancing face.

Sci Rep

School of Mines, Jiangsu Engineering Laboratory of Mine Earthquake Monitoring and Prevention, China University of Mining and Technology, Xuzhou, 221116, China.

Published: January 2025


Category Ranking

98%

Total Visits

921

Avg Visit Duration

2 minutes

Citations

20

Article Abstract

Aiming at the problems of complex stress and large deformations in the surrounding rocks of the roadway driven under the goafs of small collieries and heading for adjacent advancing coal face, by numerical modeling and field practice, the failure characteristics of the overlying coal and rocks were investigated, and the stopping and resuming times of the roadway excavation were identified. A zoning-based reinforcement technique was put forward and applied in engineering practice. The results showed that (1) The roadway roof was divided into four zones: "Rolid coal zone", "Residual pillar zone", "Roof caved zone", and "Roof un-caved zone". (2) It was determined that the roadway excavation was stopped when the unmined distance between the return airway face and the 32,101 working face was 70 m. After the 32,101 working face passed the return airway face by 90 m, the roadway driving was restarted. (3) I.e. cable reinforcement for the "residual pillar zone" and bolt-wire mesh-cable-shotcreting-grouting reinforcement for the "roof failure zone" ("Roof caved zone" + "Roof un-caved zone"). The field observation results indicated that the maximum amount of the roof-to-floor convergence and the wall-to-wall convergence was 97 mm and 69 mm, respectively, which ensured the safety of roadway excavating.

Download full-text PDF

Source
http://www.ncbi.nlm.nih.gov/pmc/articles/PMC11704020PMC
http://dx.doi.org/10.1038/s41598-024-83842-1DOI Listing

Publication Analysis

Top Keywords

zone" "roof
12
roadway driven
8
driven goafs
8
goafs small
8
small collieries
8
collieries heading
8
heading adjacent
8
adjacent advancing
8
roadway excavation
8
"residual pillar
8

Similar Publications