A PHP Error was encountered

Severity: Warning

Message: file_get_contents(https://...@gmail.com&api_key=61f08fa0b96a73de8c900d749fcb997acc09&a=1): Failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests

Filename: helpers/my_audit_helper.php

Line Number: 197

Backtrace:

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 197
Function: file_get_contents

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 271
Function: simplexml_load_file_from_url

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 3165
Function: getPubMedXML

File: /var/www/html/application/controllers/Detail.php
Line: 597
Function: pubMedSearch_Global

File: /var/www/html/application/controllers/Detail.php
Line: 511
Function: pubMedGetRelatedKeyword

File: /var/www/html/index.php
Line: 317
Function: require_once

Green gutter as a Nature-based Solution for mitigation and adaptation strategy in urban environments. | LitMetric

Green gutter as a Nature-based Solution for mitigation and adaptation strategy in urban environments.

Integr Environ Assess Manag

Department of Environmental, Land and Infrastructure Engineering (DIATI), Polytechnic University of Turin, Torino, 10129Italy.

Published: September 2025


Category Ranking

98%

Total Visits

921

Avg Visit Duration

2 minutes

Citations

20

Article Abstract

The goal of this paper is to conduct an experimental study to evaluate the efficiency of an innovative green infrastructure named green gutter made of mineral wool as a prospective green wall to delay stormwater. The pilot is formed by an unplanted prismatic vertical column of metal filled with mineral wool with 4 meters in height, width 0,6 m, and depth 0,15 m. Along its elevation, 8 moisture sensors divided in 2 lines of 4 are embedded within the filling material to assess saturation levels, flow meters are installed in the inlet and outlet of the system. The system was tested with different flows and durations to simulate distinct rain events. The monitored parameters were peak flow reduction and, peak flow delay. From the results, it could be noted that the system's performance shows a consistent capacity to delay peak flows, on average in 15 min, but a limited capacity for peak flow reduction. Higher peak flow reductions ranging from 30% to 50% were obtained only for design rains of 10 min duration and 0.5 and 5 year return period, respectively. By effectively delaying peak flow the green gutter showed to be a promising solution to be used in stormwater strategies, focused on creating time lags of peak flows among subwatersheds.

Download full-text PDF

Source
http://dx.doi.org/10.1093/inteam/vjaf122DOI Listing

Publication Analysis

Top Keywords

peak flow
20
green gutter
12
mineral wool
8
flow reduction
8
peak flows
8
peak
7
flow
6
green
5
gutter nature-based
4
nature-based solution
4

Similar Publications