A PHP Error was encountered

Severity: Warning

Message: file_get_contents(https://...@gmail.com&api_key=61f08fa0b96a73de8c900d749fcb997acc09&a=1): Failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests

Filename: helpers/my_audit_helper.php

Line Number: 197

Backtrace:

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 197
Function: file_get_contents

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 271
Function: simplexml_load_file_from_url

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 3165
Function: getPubMedXML

File: /var/www/html/application/controllers/Detail.php
Line: 597
Function: pubMedSearch_Global

File: /var/www/html/application/controllers/Detail.php
Line: 511
Function: pubMedGetRelatedKeyword

File: /var/www/html/index.php
Line: 317
Function: require_once

Optimization of small coal pillar width and control measures in gob-side entry excavation of thick coal seams. | LitMetric

Category Ranking

98%

Total Visits

921

Avg Visit Duration

2 minutes

Citations

20

Article Abstract

This study introduces an innovative optimized bolting support system specifically tailored for gob-side entry excavation in thick coal seams at a coal mine in southwestern Shandong, China. Employing theoretical analysis, numerical simulation, and field measurements, the research focuses on examining the failure characteristics of surrounding rock during gob-side entry excavation. The key innovation lies in the development of a 5-meter optimal coal pillar width, ensuring balanced stress distribution and structural integrity. Additionally, a lag time of at least 46 days between gob-side entry excavation and the upper working face retreat is recommended to mitigate roof subsidence and surrounding rock deformation. The optimized bolting support system, featuring increased bolt pretension, utilization of high-strength steel strips, and reinforcement of weak points, effectively reduces deformation of the roadway surrounding rock, meeting support requirements for normal production. This novel approach successfully addresses the support challenges in thick coal seam gob-side entry excavation, enhancing mining safety and resource recovery rates.

Download full-text PDF

Source
http://www.ncbi.nlm.nih.gov/pmc/articles/PMC11458624PMC
http://dx.doi.org/10.1038/s41598-024-74793-8DOI Listing

Publication Analysis

Top Keywords

gob-side entry
20
entry excavation
20
thick coal
12
surrounding rock
12
coal pillar
8
pillar width
8
excavation thick
8
coal seams
8
optimized bolting
8
bolting support
8

Similar Publications