A PHP Error was encountered

Severity: Warning

Message: file_get_contents(https://...@gmail.com&api_key=61f08fa0b96a73de8c900d749fcb997acc09&a=1): Failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests

Filename: helpers/my_audit_helper.php

Line Number: 197

Backtrace:

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 197
Function: file_get_contents

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 271
Function: simplexml_load_file_from_url

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 3165
Function: getPubMedXML

File: /var/www/html/application/controllers/Detail.php
Line: 597
Function: pubMedSearch_Global

File: /var/www/html/application/controllers/Detail.php
Line: 511
Function: pubMedGetRelatedKeyword

File: /var/www/html/index.php
Line: 317
Function: require_once

The performance of interrupted time series designs with a limited number of time points: Learning losses due to school closures during the COVID-19 pandemic. | LitMetric

Category Ranking

98%

Total Visits

921

Avg Visit Duration

2 minutes

Citations

20

Article Abstract

Interrupted time series (ITS) designs are increasingly used for estimating the effect of shocks in natural experiments. Currently, ITS designs are often used in scenarios with many time points and simple data structures. This research investigates the performance of ITS designs when the number of time points is limited and with complex data structures. Using a Monte Carlo simulation study, we empirically derive the performance-in terms of power, bias and precision- of the ITS design. Scenarios are considered with multiple interventions, a low number of time points and different effect sizes based on a motivating example of the learning loss due to COVID school closures. The results of the simulation study show the power of the step change depends mostly on the sample size, while the power of the slope change depends on the number of time points. In the basic scenario, with both a step and a slope change and an effect size of 30% of the pre-intervention slope, the required sample size for detecting a step change is 1,100 with a minimum of twelve time points. For detecting a slope change the required sample size decreases to 500 with eight time points. To decide if there is enough power researchers should inspect their data, hypothesize about effect sizes and consider an appropriate model before applying an ITS design to their research. This paper contributes to the field of methodology in two ways. Firstly, the motivation example showcases the difficulty of employing ITS designs in cases which do not adhere to a single intervention. Secondly, models are proposed for more difficult ITS designs and their performance is tested.

Download full-text PDF

Source
http://www.ncbi.nlm.nih.gov/pmc/articles/PMC11305537PMC
http://journals.plos.org/plosone/article?id=10.1371/journal.pone.0301301PLOS

Publication Analysis

Top Keywords

time points
28
number time
16
sample size
12
slope change
12
time
9
interrupted time
8
time series
8
series designs
8
school closures
8
data structures
8

Similar Publications