A PHP Error was encountered

Severity: Warning

Message: file_get_contents(https://...@gmail.com&api_key=61f08fa0b96a73de8c900d749fcb997acc09&a=1): Failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests

Filename: helpers/my_audit_helper.php

Line Number: 197

Backtrace:

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 197
Function: file_get_contents

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 271
Function: simplexml_load_file_from_url

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 3165
Function: getPubMedXML

File: /var/www/html/application/controllers/Detail.php
Line: 597
Function: pubMedSearch_Global

File: /var/www/html/application/controllers/Detail.php
Line: 511
Function: pubMedGetRelatedKeyword

File: /var/www/html/index.php
Line: 317
Function: require_once

Impact of the comprehensive remediation project on hydrological conditions in the lower reaches of the Ganjiang River. | LitMetric

Impact of the comprehensive remediation project on hydrological conditions in the lower reaches of the Ganjiang River.

Water Sci Technol

Construction Office of Poyang Lake Water Control Project of Jiangxi Province, Nanchang 330009, China.

Published: May 2024


Category Ranking

98%

Total Visits

921

Avg Visit Duration

2 minutes

Citations

20

Article Abstract

This study undertakes a systematic analysis of the hydrological changes before and after the implementation of the Comprehensive Remediation Project in the lower reaches of the Ganjiang River. It focuses on changes in downstream inflow, ratios of flow distribution, and water levels, as well as water velocity near the gates. The results indicate a significant improvement in the spatial distribution of water resources in the lower reaches of the Ganjiang River. The project enhances the inflow from the northern and southern branches, positively influencing downstream water usage and the ecological environment. Building upon these findings, the study proposes operational recommendations tailored to different hydrological years, such as timely adjustments to the southern branch's water inflow and optimizing flow distribution ratios. This research provides a scientific basis for the implementation and dispatch of comprehensive remediation projects and offers insights into water resource management in similar regions.

Download full-text PDF

Source
http://dx.doi.org/10.2166/wst.2024.137DOI Listing

Publication Analysis

Top Keywords

comprehensive remediation
12
lower reaches
12
reaches ganjiang
12
ganjiang river
12
remediation project
8
flow distribution
8
distribution water
8
water
6
impact comprehensive
4
project hydrological
4

Similar Publications