A PHP Error was encountered

Severity: Warning

Message: file_get_contents(https://...@gmail.com&api_key=61f08fa0b96a73de8c900d749fcb997acc09&a=1): Failed to open stream: HTTP request failed! HTTP/1.1 429 Too Many Requests

Filename: helpers/my_audit_helper.php

Line Number: 197

Backtrace:

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 197
Function: file_get_contents

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 271
Function: simplexml_load_file_from_url

File: /var/www/html/application/helpers/my_audit_helper.php
Line: 3165
Function: getPubMedXML

File: /var/www/html/application/controllers/Detail.php
Line: 597
Function: pubMedSearch_Global

File: /var/www/html/application/controllers/Detail.php
Line: 511
Function: pubMedGetRelatedKeyword

File: /var/www/html/index.php
Line: 317
Function: require_once

Influence of the flooded time on the performance of a tidal flow constructed wetland treating urban stream water. | LitMetric

Category Ranking

98%

Total Visits

921

Avg Visit Duration

2 minutes

Citations

20

Article Abstract

A vertical subsuperficial tidal flow constructed wetland (TFCW) operated under flooded time (FT) variation, was evaluated in the removal of carbonaceous, nitrogenous, and phosphorous matter from urban stream water. The TFCW downflow (117 L) was filled with bricks (44% porosity) and vegetated with Althernanthera philoxeroides (32 plants m). The TFCW was operated under different flooded times - Stage A (48 h), B (36 h), C (24 h), and D (12 h), organic loading rates of 19.58-43.83 gCOD m d, 3.68-6.94 gTN m d and 0.93-2.00 gTP m d and volumetric load rates of 46.8, 58.5, 78.0 and 11.7 L d. No significant differences were observed in the removal efficiencies to Chemical Oxygen Demand (COD 66 to 94%), Total Ammonia Nitrogen (TAN 58 to 87%), and Total Nitrogen (TN 53 to 78%) among the stages, and nitrate concentrations lower than 6 mg L in the effluent. High Total Phosphorus removal was obtained in FT of 48 h (TP 79%). Total phosphorus loading rate was a limiting factor in TP removal, which reduced along with the reduction of FT. The nitrifying community was present over time since ammonia-oxidizing bacteria (Nitrosospira) and nitrite-oxidizing bacteria (Nitrobacter and Nitrospira) were identified in operational stages with variation in relative abundance, but TAN removal efficiency did not show significant differences. There was no change in the denitrifying community structure, indicating that FT did not influence the TN removal. A. philoxeroides was responsible for phytoextraction of 2.1% of TN and 2.7% of TP from the total removed by TFCW. TN removal (65%) was attributed to adsorption in the filtering material and microbial metabolism during the rest time. The findings of this study suggest FT of 12 h to remove COD and TN, and equal to or higher than 48 h to remove TP.

Download full-text PDF

Source
http://dx.doi.org/10.1016/j.scitotenv.2020.143652DOI Listing

Publication Analysis

Top Keywords

flooded time
8
tidal flow
8
flow constructed
8
constructed wetland
8
urban stream
8
stream water
8
tfcw operated
8
operated flooded
8
total phosphorus
8
removal
7

Similar Publications