98%
921
2 minutes
20
Allogeneic hematopoietic stem cell transplantation (alloHSCT) has become a well-established treatment option for many patients suffering from malignant and non-malignant diseases. In the past decade, high-resolution HLA-typing, remission surveillance, pre-emptive immune intervention, and standardisation in supportive care measures have substantially improved transplant outcomes. This retrospective study evaluated transplant procedures in 162 paediatric patients with acute lymphoblastic leukaemia (n = 124) or acute myeloid leukaemia (n = 38) who received their first alloHSCT in our institution over an 11-year period. We observed a significant reduction in risk of non-relapse mortality (NRM) over time (HR = 0.34, 95% CI 0.12-0.98; P = 0.05), the 4-year NRM estimate decreased from 20% in 2005-2008 to 7% in 2012-2016 (P = 0.02) and an increase in survival after relapse. There was no significant difference in patients who received a graft from a sibling, haplo, or an unrelated donor with regard to their overall survival (P = 0.45), event-free survival (P = 0.61), and non-relapse mortality (P = 0.19). Our data suggest that a specific transplant infrastructure with a highly experienced team in an accredited transplant centre likely contributes to better transplant outcomes for acute leukaemia patients in complete remission regardless of donor type.
Download full-text PDF |
Source |
---|---|
http://dx.doi.org/10.1038/s41409-018-0341-z | DOI Listing |
J Nephrol
September 2025
Institute of Nephrology, Madras Medical College, Chennai, India.
Background: IgA nephropathy is a disease with a highly variable natural history, for which there is an increasing understanding of the role of complement activation in its pathogenesis and progression. We aimed to assess the clinical and prognostic implications of C4d staining in the kidney biopsy of IgA nephropathy patients.
Methods: This was a retrospective observational study wherein the medical records of IgA nephropathy patients were reviewed and baseline characteristics, kidney biopsy findings, treatment response and follow-up data were noted.
Cancer
September 2025
Thoracic Oncology Service, Department of Medicine, Memorial Sloan Kettering Cancer Center and Weill Cornell Medical College, New York, New York, USA.
Background: Trials of neoadjuvant chemoimmunotherapy (chemoIO) have changed the standard of care for resectable nonsmall cell lung cancer (NSCLC). This study characterizes the outcomes of off-trial patients who received treatment with neoadjuvant chemoIO.
Methods: The authors analyzed records of patients with stage IB-III NSCLC who received neoadjuvant chemoIO with an intent to proceed to surgical resection at three US academic institutions.
Immunotherapy
September 2025
Department of Dermatology and Allergology, University Hospital, LMU Munich, Munich, Germany.
Currently, the first-line treatment of non-metastatic Merkel cell carcinoma (MCC) is complete resection. In case of unresectable or metastatic MCC, immune checkpoint inhibitor (ICI) therapy with avelumab (or in the US also pembrolizumab or retifanlimab) is indicated. We report on a patient with a primary, non-metastatic MCC on the left eyelid and amyotrophic lateral sclerosis (ALS).
View Article and Find Full Text PDFRadiology
September 2025
Department of Radiology, Samsung Medical Center, Sungkyunkwan University School of Medicine, 81 Irwon-ro, Gangnam-gu, Seoul 06351, Korea.
Background The optimal surgical management of human epidermal growth factor receptor 2 (HER2)-positive breast cancer with calcifications remains controversial, particularly when pathologic complete response (pCR) is suspected. Purpose To identify factors associated with pCR after neoadjuvant chemotherapy in patients with HER2-positive breast cancer and assess whether calcifications affect the performance of radiologic complete response (rCR) at MRI for predicting pCR. Materials and Methods This retrospective study included patients with HER2-positive breast cancer who received neoadjuvant docetaxel, carboplatin, trastuzumab, and pertuzumab and underwent surgery between January 2021 and October 2023.
View Article and Find Full Text PDFBackground: This study aimed to identify the diagnostic and prognostic ability of serum miR-411-3p in patients with acute myeloid leukemia (AML).
Methods: Blood samples were collected from 60 AML patients and 60 healthy controls to measure serum miR-411-3p and thereafter discuss its potential clinical value.
Results: Serum miR-411-3p was decreased in AML patients and was even lower in those with M4/M5 subtypes or high white blood cell count or adverse cytogenetic risk.